This project included the renovation of the original Leavenworth Courthouse. JPI began work in the fall of 2003 and completed in May 2004.
![]() |
![]() |
![]() |
This project included replacing the existing sashes and surrounding deteriorating wood. In over 40 windows on this job, JPI replaced existing 1/4" glass with 5/8" insulated Low-E units.